After implementing 12 months (from November 2006 to November 2007), studying group designed system and 9 solar power system suitable to natural condition and climate in Con Dao; trained to transferred technique how to operate and maintain solar power system.
Then Council requested head of the project to add process of maintaining this solar power system. This project was awarded excellent grade.